Two suppliers quote for what looks like the same material — F36 brown fused alumina in tonne bags, same destination port — and the prices come back different. The gap rarely comes from arithmetic. Usually the two offers rest on different assumptions about what the material is and what the price includes. Breaking a quotation into its components shows where the money goes.
Grade and raw materials
Grade is the main factor. Brown fused alumina is produced by smelting calcined bauxite in an electric arc furnace, and grades are defined mainly by alumina (Al2O3) content. A higher-alumina grade starts from selected raw material, takes more energy to fuse, and yields less usable grain, so it costs more before any processing begins. A grade name alone is not a specification: ask what minimum Al2O3 content the quotation guarantees and whether a batch test report will accompany the shipment. Two offers at different prices may simply be two different grades wearing similar labels. The F-grit range shows the grade bands used.
Power and processing
After smelting, the fused ingot is crushed, milled, screened and graded; each stage adds cost — energy, wear parts, labour and yield loss. Grit size matters here: a coarse size such as F24 for blasting passes through fewer screening stages than a fine size such as F220, which yields less saleable material per tonne and needs closer control of the fine tail. A tighter size distribution within the same nominal grit also costs more to hold, because more material is screened out and reprocessed. Compare the distribution commitment, not only the size name.
Quantity and packing
Quantity changes the unit economics: a one-tonne trial lot is picked, packed, documented and shipped as a small consignment, so its cost per tonne is far higher than a full container’s. A trial price is therefore not a reliable guide to a bulk price. Packing adds its own share. Small 25 kg bags mean more filling and handling labour per tonne; tonne bags cost more per bag but load faster; pallets add material and freight volume. If one quote assumes loose tonne bags and another palletised 25 kg bags, part of the gap is packing, not material — state the packing you need in the enquiry itself.
Freight and delivery basis
A quotation is only complete with its delivery basis. Material prices usually include inland freight from the plant to the loading port; beyond that, an FOB price stops at the port, while a delivered price adds ocean freight that moves with the shipping market. Comparing an FOB offer with a delivered offer, without separating the freight, produces a false winner. Ask every supplier to quote on the same basis, and name your destination port even when asking for FOB — it helps the supplier plan loading and documentation.
Comparing two quotes fairly
Before deciding, line the offers up and check six rows: guaranteed grade and test method; sizing standard and distribution commitment; quantity basis; packing; delivery basis and destination; and the documents included — product data sheet, batch test report and lot labelling. If a row differs, you are comparing two products, not two prices. The fastest route to a usable quote is to send five items in the first message: grade, grit size, quantity, packing and destination port. With those five, a supplier can price the actual material and logistics — start with the inquiry form.